Skip to main content

4G GPS Tracker

Magnetic GPS Tracker GAT26 | GreatWill

Great Will GAT26 GPS tracker is compact, supports patch cards, features intelligent energy saving, and uses as little as 7uA in sleep mode. It can operate in temperatures as low as -25??C. It features an anti-detection function, can quickly connect online within 30 seconds, offers three flexible operating modes, supports remote parameter setting via SMS and app, and provides a remaining power indicator and a light sensor removal alarm.

  • GPS Positioning + Beidou + Wi-Fi + LBS + AGPS
  • 4G+2G Full Network Access
  • Light Sensor Anti-Tamper
  • Built-in Integrated LTE + Wi-Fi Antenna

Have questions? We're here to help.

简单邮箱表单

Magnetic Long-Standby GPS Tracker — GAT26

GAT26 is a 4G+2G wireless magnetic tracker with a 4200mAh non-rechargeable battery, GPS/BeiDou/Wi-Fi/LBS positioning, light-sensor tamper detection and ultra-low standby current for long-term asset and vehicle monitoring.

GAT26 multi-satellite positioning

Multi-Satellite Positioning

GPS, BeiDou, Wi-Fi and LBS positioning work together to improve location continuity across outdoor, urban and weak-GNSS environments.

Ultra-Long Standby

With standby current below 7µA and approximately 1400 supported position reports, GAT26 is designed for low-maintenance long-duration tracking projects.

GAT26 ultra-long standby
GAT26 removal alert

Removal Alert

The built-in light-sensor chip can detect unexpected exposure when the device is removed, helping generate a tamper alert for monitored assets or vehicles.

Strong Magnetic Mounting

Built-in magnetic mounting allows quick installation on compatible metal surfaces without permanent wiring, supporting flexible asset and vehicle deployments.

GAT26 magnetic mounting

Technical Specifications

SpecificationGAT26
Network4G LTE-FDD + 2G GSM
Working VoltageDC 3V, CR123A battery system
Dimensions70mm × 40mm × 30mm
Location Accuracy<10 Meters
PositioningGPS + BeiDou + Wi-Fi + LBS
Standby Current<7µA
Built-in Battery4200mAh / 3V, non-rechargeable
Working Temperature-20°C to +70°C
Storage Temperature-25°C to +85°C
Tamper SensorBuilt-in Light Sensor
ProtocolJT/T 808, customizable
Battery LifeApprox. 1400 position reports

Main Features

Real-Time Tracking

Magnetic Mount

Removal Alarm

Multi-Positioning

Ultra-Low Power

GAT26 Applicable Scenarios

GAT26 fixed asset management

Fixed Asset Management

GAT26 logistics vehicles

Logistics Vehicles

GAT26 leasing mortgage management

Leasing & Mortgage Vehicle Management

Bulk Magnetic GPS Trackers Ready-to-Ship

GreatWill supplies GAT26 long-standby magnetic trackers for fixed assets, logistics vehicles and finance projects with OEM/ODM support.

Technical support, testing and project-specific warranty terms are available.
Sample and bulk lead times depend on quantity and customization; multiple shipping methods are supported.
GAT26 combines ultra-low standby current, strong magnetic mounting, multi-mode positioning and light-sensor tamper detection for long-term wireless tracking.