Multi-Positioning, Expandable Vehicle Tracking — GT25
GT25 is an IP67-rated 4G LTE vehicle GPS tracker with 2G fallback, multi-mode positioning and flexible interfaces for commercial vehicle, fleet and equipment tracking. It supports BDS, GPS, LBS and Wi-Fi positioning, RS485 expansion, multiple I/O options and optional Bluetooth 5.1.

Multiple Intelligent Positioning Options
GT25 supports BDS, GPS, LBS and Wi-Fi positioning, with assisted positioning for faster fixes. Multi-mode positioning helps maintain location visibility across outdoor, urban and weak-GNSS environments.
Professional Expandability
A standard RS485 port plus multiple reserved I/O interfaces support project integration with external sensors and accessories. Optional Bluetooth 5.1 is available for compatible short-range configuration and expansion scenarios.


4G + 2G Network
LTE Cat-1 connectivity with 2G fallback supports deployment across multiple regional network environments and helps maintain data communication where compatible cellular coverage is available.
IP67 Waterproof and Dustproof
The IP67-rated housing and aviation-style connector improve resistance to water, dust and demanding operating environments, supporting commercial vehicle and equipment deployments.

Technical Specifications
| Specification | GT25 |
|---|---|
| Network | 4G LTE-FDD/TDD (2G Fallback) |
| Working Voltage | DC 9V–90V |
| Dimensions | 88mm × 38mm × 17mm |
| Location Accuracy | <10 Meters |
| Positioning | BDS + GPS + LBS + Wi-Fi |
| Ingress Protection | IP67 |
| Backup Battery | 450mAh / 3.7V |
| Working Temperature | -20°C to +70°C (-4°F to 158°F) |
| Expansion Interfaces | RS485, Multi-I/O, 1-Wire, MIC |
| Bluetooth | Bluetooth 5.1 (Optional) |
| Protocols | GT06, JT/T808 |
| Weight | 45g |
Main Features
Real-Time Tracking
Remote Cut-Off
IP67 Waterproof
RS485 Port
DC 9–90V
GT25 Applicable Scenarios

Passenger Vehicle Fleet

Commercial Vehicle Fleet

Off-Road Mobile Machinery
Bulk GPS Tracking Devices Ready-to-Ship
GreatWill supplies GT25 vehicle GPS trackers for fleet, asset and heavy-equipment projects, with OEM/ODM customization available for regional networks, interfaces and deployment requirements.