Safe, Controllable 4G Vehicle Tracking — GT24N
GT24N is a hardwired 4G LTE Cat-1 vehicle GPS tracker for fleet, rental and automotive-finance applications. It combines GPS/BDS/GLONASS positioning with Wi-Fi/LBS assistance, ACC detection, geofencing, alarms, blind-spot data supplementation and remote fuel/power cut-off.

Fuel / Power Cut-Off
Remote cut-off commands can be issued through the compatible platform or SMS for anti-theft and risk-control scenarios. Safe deployment should follow project rules and only execute immobilization when vehicle conditions allow it.
Multi-Band Connectivity & Multi-Mode Positioning
4G LTE Cat-1 connectivity is paired with GPS, Beidou and GLONASS satellite positioning plus Wi-Fi and LBS assistance. The combination improves location availability across outdoor, urban and partially obstructed environments.


Wide Application Scenarios
Geofencing, ACC detection, overspeed alerts, vibration/displacement alarms and remote control make GT24N suitable for automotive finance, rental fleets and logistics operations that require continuous vehicle visibility and risk control.
Technical Specifications
| Specification | Details |
|---|---|
| Network | 4G LTE Cat-1 |
| Working Voltage | DC 9V–90V |
| Positioning | GPS + BDS + GLONASS + Wi-Fi + LBS |
| Location Accuracy | ≤10m under suitable GNSS conditions |
| Built-in Battery | 55mAh / 3.7V industrial-grade lithium polymer |
| SMS | VoLTE short message service |
| GPS Antenna | Built-in 25 × 25 × 4mm ceramic antenna |
| Device Memory | 2+2MB |
| Blind Spot Data Supplement | Up to 700 entries per platform |
| Working Temperature | -10°C to +70°C (14°F to 158°F) |
Main Features
Wide Voltage Operation
Real-Time Positioning
Vibration Alarm
Blind Spot Data Storage
Remote Cut-Off
GT24N 4G Hardwired GPS Tracker Applicable Scenarios

Automotive Finance

Vehicle Rental Industry

Logistics & Transportation
Bulk 4G GPS Tracker Devices Ready-to-Ship
GreatWill supplies GT24N hardwired 4G trackers for fleet, rental and automotive-finance projects, with OEM/ODM customization for regional networks and platform integrations.

