Dual-Lens Clarity, Uninterrupted Recording — GD95L
GD95L is a 4G HD driving recorder for commercial fleets, with dual built-in 1080P cameras, an optional external 1080P camera, H.265/H.264 compression, a built-in supercapacitor, wide-voltage input, GPS/BeiDou/GLONASS positioning, and up to 512GB TF-card storage.

Dual 1080P HD Video
Simultaneously capture the road ahead and cabin/rear area in 1080P, with support for an additional external 1080P camera. Clear video helps preserve license plates, road conditions, and in-vehicle context for incident review and driver training.
Supercapacitor for Data Protection
The built-in supercapacitor provides short-term backup power when vehicle power is suddenly interrupted, allowing the recorder to save the final video file properly and reducing the risk of corrupted or lost evidence.


Critical Event Alerts & Evidence
Receive event notifications for harsh braking, sharp turns, collisions, and other configured conditions. Important clips can be locked and uploaded to a compatible server or fleet platform, giving managers immediate context for investigation.
Technical Specifications
| Specification | GD95L |
|---|---|
| Network | 4G LTE-FDD / LTE-TDD |
| Working Voltage | DC 8V–36V |
| Dimensions | 125.6 × 86.6 × 46.9 mm |
| Positioning System | GPS + BeiDou + GLONASS |
| Cameras | 2 × built-in 1080P, 1 × external 1080P (optional) |
| Location Accuracy | < 10 m |
| Storage | 1 × TF card slot, up to 512GB |
| Typical Power Consumption | < 10W |
| Working Temperature | -20°C to +70°C (-4°F to 158°F) |
| Standby Power | Built-in supercapacitor |
| Video Compression | H.265 / H.264 |
| Wi-Fi | 2.4GHz |
Main Features
Real-Time Tracking
Dual 1080P Video
Wide Voltage 8–36V
Supercapacitor
Parking Monitoring
GD95L 4G Dash Cam — Applicable Scenarios

Insurance Telematics & UBI

Fleet Management & Logistics

Ride-Hailing & Taxi Services
Bulk Dashcam Devices Ready-to-Ship
GreatWill maintains stock of market-proven dashcam devices such as GD95L for fleet operators, distributors, and resellers. OEM, ODM, and project customization services are available for commercial deployments.



