Intelligent Fleet Safety, Powered by AI — GD14N
GD14N is an advanced 4G AI dash cam for fleet safety. It combines a forward-facing ADAS camera and an inward-facing DMS camera to monitor road conditions and driver behavior, while 4G connectivity, GPS + BeiDou positioning and local storage support remote fleet supervision and incident evidence.
Live Video & GPS Tracking
Use 4G connectivity to remotely view live video from the dual cameras and track vehicle location with GPS + BeiDou positioning for real-time fleet visibility.
AI-Powered ADAS & DMS Alerts
ADAS and DMS functions help identify driving risks such as potential collisions, fatigue, distraction, phone use and smoking, with voice or platform alerts depending on configuration.


Critical Incident Recording & Evidence
The built-in G-sensor detects harsh driving events and helps protect corresponding video files. Support for up to a 512GB TF card provides substantial local storage for incident evidence.
Technical Specifications
| Specification | GD14N |
|---|---|
| Network | 4G LTE Cat 1 |
| Working Voltage | DC 9V – 36V |
| Location Accuracy | <10 Meters |
| Positioning System | GPS + Beidou |
| Cameras | Forward: 1080P@25fps; Inward: 1080P@25fps with IR |
| CPU | SA230D |
| Storage | 1 x TF Card Slot, up to 512GB |
| AI Systems | ADAS, DMS |
| Working Temperature | -20°C to +70°C (-4°F to 158°F) |
| Storage Temperature | -30°C to +85°C (-22°F to 185°F) |
| G-sensor | Built-in 3-axis |
| AI Trigger Speed | >30 km/h (18.6 mph) |
Main Features
ADAS Alerts
DMS Alerts
Dual 1080P Video
512GB Max Storage
4G Live Video
GD14N 4G AI Dash Cam Applicable Scenarios

Driver Behavior Analysis

Commercial Vehicle Monitoring

Fleet Safety Management
Bulk Dashcam Devices Ready-to-Ship
GreatWill supports rapid dash cam wholesale and maintains regular stock of market-proven AI vehicle cameras. OEM, ODM and customization services are available, and GD14N is designed for fleet projects that require dual-channel 1080P video, ADAS/DMS functions and 4G remote management.



