Skip to main content

4G GPS Tracker

Asset GPS Tracker GAT23 | GreatWill

The Great Will GAT23 wireless GPS device has two main advantages: a strong magnetic field and no installation required, as well as an ultra-long battery life. It can be used with a strong magnetic attachment that does not require complicated installation. Its built-in 5000 mAh battery and IP65 waterproof design make it suitable for various environments.

  • Real-time Positioning
  • 4G+2G Full Network Compatibility
  • Multiple Alarm Functions
  • Tamper Alarm

Have questions? We're here to help.

简单邮箱表单

Long-Battery Wireless Asset Tracking — GAT23

GAT23 is a 4G LTE Cat-1 wireless GPS tracker with GPS + BeiDou positioning, a 5000mAh battery, multiple alarm functions and several low-power operating modes. It is designed for asset, vehicle and personnel location monitoring.

GAT23 Precise Positioning and Tracking

Precise Positioning and Tracking

GPS + BeiDou positioning provides real-time location reporting and historical route information for asset, vehicle and personnel tracking, with positioning accuracy under 10 meters in suitable conditions.

Multiple Alarm Systems

GAT23 supports vibration, low-battery, overspeed, geo-fence and tamper alarms to help protect tracked assets and alert operators to abnormal events.

GAT23 Multiple Alarm Systems
GAT23 Battery Power and Operating Modes

Battery Power and Operating Modes

A 5000mAh battery supports normal, smart-sleep, deep-sleep and scheduled power-on modes, allowing deployments to balance update frequency with battery endurance.

Technical Specifications

SpecificationGAT23
Network4G LTE Cat-1
Working VoltageDC 4.2V
Dimensions87mm × 54mm × 26mm
Location Accuracy<10 Meters
PositioningGPS + BeiDou
Standby Current5–8mA
Battery5000mAh
Working Temperature-30°C to +80°C (-22°F to 176°F)
Ingress ProtectionIP65
Continuous Working TimeApprox. 55 Hours
Standby TimeApprox. 1000 Hours
MicrophoneBuilt-in

Main Features

Real-Time Tracking

5000mAh Battery

IP65 Protection

Tamper Alert

Blind-Spot Storage

GAT23 Applicable Scenarios

GAT23 Personnel Location Tracking

Personnel Location Tracking

GAT23 Vehicle Fleet Tracking

Vehicle Fleet Tracking

GAT23 Asset Anti-Theft Management

Asset Anti-Theft Management

Bulk GPS Tracking Devices Ready-to-Ship

GreatWill supplies GAT23 wireless GPS trackers for vehicle, asset and personnel-tracking projects, with OEM/ODM customization available for compatible regional and commercial deployments.

  • After-sales technical support and product testing are available.
  • Configurations can be adjusted for local networks and project requirements.
  • Warranty coverage can be up to 3 years depending on the project and commercial agreement.
  • Sample delivery is typically about 3–5 days.
  • Large-volume orders generally require more than 7 days depending on quantity and customization.
  • Devices, platform software and SIM/IoT-card configurations are inspected before shipment.
  • Multiple shipping methods are supported.
  • GPS + BeiDou dual-mode positioning improves satellite availability across varied environments.
  • Real-time location queries help operators monitor current asset or vehicle position.
  • Historical route records support route reconstruction and movement review.
  • A 5000mAh battery and multiple sleep modes support longer untethered operation.