4G Full Network IoT Card + Data Pool Plan — Great Will
IoT cards are designed exclusively for connected devices, offering affordable and stable connectivity with batch management, industrial-grade durability, and shared data usage.

High Cost-Effectiveness
Low data cost makes IoT SIM cards more cost-effective than standard SIM cards. The lower cost per data unit is well suited to long-term use across large device deployments.
Exclusive for GPS Devices
Designed for data communication rather than voice calls, these cards are ideal for GPS trackers, dash cams, monitoring devices, shared equipment, and other connected hardware.


Industrial-Grade & More Durable
Built to withstand high and low temperatures and vibration for a longer service life. Ideal for vehicles, outdoor equipment, and long-term installations where frequent card replacement is impractical.
Background Batch Management
Monitor data usage, enable or disable cards, and renew subscriptions remotely through the management backend. This simplifies fleet operations and large-scale device management.

Technical Specifications
| Specification | M2M SIM IoT Card |
|---|---|
| Device Compatibility | Confirm network mode, card type (MP/MS/eSIM), and APN settings supported by the terminal. |
| Customized Data Plans | Select plans based on device data usage (e.g., 5–10 GB/month for dash cams, 100–500 MB/month for GPS trackers). |
| APN Configuration | Use carrier-specific APN settings to ensure secure and stable data transmission. |
| Remote Management | Connect to the carrier management platform for data monitoring, anomaly alerts, and remote diagnostics. |
| Global IoT Card | Supports roaming in 200+ countries and regions with automatic multi-carrier switching for cross-border connected devices. |
| Local Carrier Card | Choose a local carrier card in target markets such as Europe or North America for lower cost and stable signal. |
| eSIM Advantages | No physical card replacement required; supports remote carrier switching and multi-region B2B deployments. |
Why Choose Great Will?
- One-stop solution: global connectivity, customized plans, management platform, and technical support.
- Direct carrier partnerships: simplified sourcing, competitive pricing, and reliable network quality.
- Strong scalability: supports deployments from a few devices to large fleets with more than 100,000 endpoints.
- High security: private-network options, data encryption, and device-level control.