Multi-Network Wired Vehicle Tracking — GT22
GT22 is a 4G+2G wired GPS tracker for vehicle security and fleet management. It combines GPS, BDS, LBS and AGPS positioning with route playback, blind-spot data storage, vibration alarms and remote engine control.
Real-Time Tracking Positioning
GPS, BDS, LBS and AGPS positioning work with 4G and 2G communication to provide location information for daily vehicle monitoring across compatible network environments.
Historical Route Playback
Compatible management platforms can store and replay historical movement data, helping operators review routes, vehicle activity and past trips.


Remote Engine Control
When correctly connected to compatible vehicle circuits, authorized users can remotely control engine power to support anti-theft and fleet-management workflows.
Vibration Alarm System
A built-in vibration sensor can report abnormal movement or contact events to help owners detect possible theft or unauthorized vehicle activity.

Technical Specifications
| Specification | GT22 |
|---|---|
| Network | LTE-FDD B1/B2/B3/B4/B5/B7/B8/B28/B66; GSM 850/900/1800/1900MHz |
| Positioning | GPS + LBS + BDS + AGPS |
| Location Accuracy | <10 Meters |
| Working Voltage | DC 9V–90V |
| Working Current | Approx. 30mA @ 12V |
| Backup Battery | 55mAh / 3.7V Industrial Li-Poly |
| Dimensions | 79mm × 33.3mm × 12.5mm |
| Working Temperature | -20°C to +70°C (-4°F to 158°F) |
| Storage Temperature | -40°C to +85°C (-40°F to 185°F) |
| Communication Module | A7670 Series |
| Location Module | AT6558R |
| Warranty | 12+ Months |
Main Features
Real-Time Tracking
Blind-Spot Storage
Vibration Alarm
Remote Engine Control
DC 9–90V
GT22 Applicable Scenarios

Commercial Fleet Management

Freight Security Control

Valuable Equipment Tracking
Bulk GPS Tracking Devices Ready-to-Ship
GreatWill supplies GT22 wired GPS trackers for commercial fleets, freight security and equipment-tracking projects, with OEM/ODM support for regional networks and platform integration.